Confirm the adequacy of the structural, mechanical, electrical and plumbing (MEP) systems, to include telecommunications, and other conditions to ensure that when installed new and used commodities shall function for their intended purpose.
Coordination of installation mock-ups or demonstrations for determining design solutions and integration with construction constraints to include Architecturally Significant Equipment.
Synchronize between vendors for integration within the different vendors where there are dependencies such as equipment interfaced with patient headwalls.
Identify conflicts in infrastructure specifications, code compliance, and space conflicts. Typically, a review is conducted through a combination of reviewing design/construction drawings and an on-site evaluation of the built environment.
Assure availability of the delivery routes (floor loads, door widths, hallway widths, ceiling heights, stairs, elevator size and capacity) within the new facility to the installation location.